For Berliner Wasserbetriebe, we are building a heat exchanger within a wastewater pressure line with a total length of 240 metres, pipe in pipe. The diameters of the two pipes differ by 10 cm. Warm wastewater will flow inside and water used for heating will flow in the space between. After completion, the pipe will be connected to a newly planned residential park with apartment buildings.

Standort:
Unterlagen an: 
Ansprechpartner: 

Telefon:

Ludwig Pfeiffer Hoch- und Tiefbau GmbH & Co. KG
Anton-Zickmantel-Straße 50
04249 Leipzig